Brecknell Willis Phase 1

Customer:
Wabtec Group
Loaction:
Completed:
2015
Duration:
30 weeks
Cost:
£1.8m
Sector:
Industrial

Project Description

Soldi were appointed in a construction management role under a JCT design and build contract. The success of this project was overcoming the challenge of installing large internal overhead cranes within the completed building.