Brecknell Willis Phase 1
- Customer:
- Wabtec Group
- Location:
- Chard
- Completed:
- 2015
- Duration:
- 30 Weeks
- Cost:
- £1.8 million
- Sector:
Project Description
Soldi were appointed in a construction management role under a JCT design and build contract. The success of this project was overcoming the challenge of installing large internal overhead cranes within the completed building.
Back to ProjectsSimilar Projects
River Lavant Diversion
Soldi were appointed as main contractor for the River Lavant diversion works Chichester ...
Brecknell Willis Phase 2
Soldi were appointed in a construction management role under a JCT design and build contract following the success of phase 1......
Bridgend RDC
Soldi were appointed as main contractor for the Bridgend RDC to make internal alterations to the staff and welfare areas......